Installation & Costs
Following is a summary of typical installation and costs.
Concrete or Clay Pavers
Pavers are placed over a compacted crushed rock base and a one inch layer of sand. Once installed, pavers are ready for immediate use.
Cost: Moderate
Concrete
Usually installed over existing soil or a sand base. Must wait 5 to 7 days before use.
Cost for stamped concrete: High
Cost for ordinary concrete: Moderate
Asphalt
Typically asphalt is installed over a compacted aggregate base. You should wait 3 to 5 days before use.
Cost: Low